I started on these next two buildings after chopping and changing my mind about their sizes over several weeks.Bting the bullet, I took a further hour to finally decide their sizes.
On the left is the building I call the Bank, its footprint is approximately 10" square (26cm). The building adajcent to it is just referred to as no.4, its footprint is a mere 9"x5" (approx. 23cm x 12cm).
Here's the pics of my progress:
 |
Building #3 - the Bank
|
 |
Building #4
|
It took me nearly ten hours over two days to plan, draw and cut-out all the pieces needed. The 'Bank; has double thickness walls that required careful measuring for the inside layer. There's also a step up into the 'Bank' and a raised rear patio area. So a ground floor of foamboard was necessary.
 |
Front of the 'Bank'
|
 |
Rear of the 'Bank'
|
 |
The left side of the 'Bank'
|
 |
Front of #4
|
 |
The rear of #4 (obligatory blurry photograph)
|
 |
| Three-quarter view to compliment the photo below to show what I was working from. |
|
 |
The only view of this side of #4 that I could find
|
It was this view that made me re-cut the long rectangular narrow window above the lean-to about 2cm lower than I'd done originally, The original position is just visible in the three-quarter view above.
The lean-to has had the horizontal bricks scored, but the vertical cuts have still to be made.
 |
The front of the 'Bank' with its imposing entrace
|
The front of the 'Bank' has a very imposing entrance (my reason for calling it the Bank) and I had to spend a whole two hour session getting it looking even partially similar (and it's still not finished - Ed.)
 |
Progress so far, still a fair bit to do on this.
|
 |
Mock-up showing how it looks, not glued on yet, for ease of working on it.
|
I've been well above my 'hour a day' regime, clocking in some twenty plus hours over the last six days.There's a lot of work still to do to get these two models anywhere near finished, windows and panes (a pain to do), doors and of course roofs, the 'Bank' has a flat roof with a parapet (with some decoration)'. 'Number 4' has a very long sloping tilesd roof and a very small bit of the other side, plus of course the stonework and roof of the lean-to has to be done. I doubt I'll get all this finished in a single week and will be taking it much easier. I found that towards the end of long sessions, I was making mistakes that meant re-cutting etc..
That's it then for another week, thanks for taking the time to visit, hopefully there was something of interest.
As always your comments are welcomed and appreciated.