Continuing with the ongoing saga of my MDF Factory Building and prompted by Colgar6 (see last
Almost there !
week's post's comments). I too wondered why it was taking me so long to complete despite my dedicating at least an hour a day. In an effort to finish this build once and for all, I bit the bullet and doubled my effort to at least 2 hours a day and knowing I had yet another hospital appointment this last week, on one day I managed a full six hours, be though it in two shifts.
Despite all my effort though I did run out of time (and to be fair, enthusiasm too).
Whilst I'm by no means a perfectionist as you have probably noticed by my painting skills (- or lack thereof) but I do like a building to have some semblance of reality.
The holey floor (though not of Anitoch)
So the first problem I needed to tackle in the 'race' to finish was the middle floor. As can be seen in  the photograph to the left, it is neither completely rectangular not whole.
The two extra 'bits on the long side (each sticking proud by approximately 1mm) are the supports for the floor! The intention is being that they will sit on the slots cut into the inner wall inserts. 
The renovated floor, cut down to a rectangle.

The hole however would have has no use  in a real building, it's not for an internal staircase but as far as I can tell it to enable the gamer to insert his finger and remove the inner floor. - great if you don't mind less space for figures to stand and maybe the occasional one falling through the hole. It also occurred to me that any internal fittings had to accommodate the the angled removal of the floor (to release it from the slots.).
With all of the above in mind, I used the hole insert that came with the kit, scored it to look like the planking of the rest of the floor and glued it back in place. It's not perfect but adequate and will be disguised or hidden by office furniture,  

The two inert walls,.
I was actually multi-tasking on several things so,whilst waiting for one thing to dry, I was painting something else.
I decided to go for a colour scheme of blue (as in so many of my builds), a deep greyish-blue for the doors and a lighter blue for the upstairs internal office 'bit'. The frames of the internal windows would be slightly off-white, contrasting slightly with the external ones. The single upper floor door would also be slightly brighter that the the others.
the internal ground floor walls would be the same colour as the the external undercoat (a murky coffee colour).
Internal long wall showing the slot.
I carefully drew a line on each of the four internal walls showing where base of the upper floor would be, using the slots as my guide. This line was a very useful guide to where the colour changed from the blue of the upper floors to the coffee colour lower floor.
I could have made the doors on the building openable, but some tim ago I did realised that the upper door would have to open outwards (a rarity on any building in my experience) if it opened inwards the problem of having the removable floor re-emerges, so the upper door would be glued in place, in a closed position.
To disguise the two slots as best I could, the inner-sidse of the external walls both had a coating of the blue too.  Though I thought that  this was a very unsatisfactory.solution. I remedied this at a later stage by cutting two inserts from the cardboard scrap from the walls. If the walls had retained the cut-out bits then I would have used them, however they had dropped off  (through?) sometime during production.
Wall with new insert
 The inserts don't fit particularly well, but I do think that they're better that leaving that gaping slot and with a few posters/signs on the walls and a bit of office furniture to distract the eye, they'll hardly be noticeable.
The thinner of the two slots is well hidden by the depth of the larger windows  and only the two end bits are really in evidence.
 The large blue door, in the photograph  to the right, has been left in place and is intended to stay that way, whereas the other pair of large doors had come adrift at the unpacking stage of this build and will be glued in place slightly open (probably, possibly, maybe).
Other wall, with barely noticeable 'slot'
 The two longer internal walls both had a long strip of MDF, cut from the scrap (I rather liked the two bits I used as to me, they looked a bit more industrial than two plainer  rectangular pieces would) .
I used the bottom edge of where the slot is for reference for gluing them in position.
Throughout this build I've used multiple clamps in an effort to stop the cardboard curling from either glue or paint, mostly to little effect. Once glued and clamped to the external MDFwalls though, this will be assuaged somewhat. 


The roof. (yes, boring I know)
Whilst clamping and gluing was underway on the internal walls,m my attention was drawn to the external parts of the model. The roof had several coats of greys, blues and greens to get a neutral looking colour and similarly the ground floor, though this had brown rather than blue added as well as an off-white sandy colour 'highlight'

The fire escape was given an overall rust-effect treatment then gone over with black, so as not to lose its overall original colour completely. Doors were given their first rust-over too, but not to the same extent and the outside wall were all highlighted with a sandy colour,
Staircase, disappointingly hardly showing its rust
Once the inner wall were glued in place the middle floor would drop nicely in place on the two bits of scrap I'd glued in place and the roof would drop onto the upper card edges of the inner walls. (even though the card is only about 1mm thick the roof should be ably supported by them.
After which all that would remain to do was for me to decide the colour of the ventilation stack (and whether or not to remove the 'end piece'; finish off the roof hatch (deciding first if it's going to be openable or not);, glue the remaining three doors in place and I did glue the four inner-wall insets in place. Once all that lot was done then I can do a bit of tarting up (or detailing as some may prefer to say) and it'll be finished ! ^Yay^
I did manage to glue  the two shorter inner wall  to the inside of the building as can be seen in the photograph below

Two inner walls in place, holding up the roof 
Aaarrrggghhhh !!!
At this stage I though it would be all clear sailing, so to speak, but there was another 'problem', or at least something I wasn't at all happy about. 
The inner walls have to sit in the centre of the outer walls and therein lies the problem. Whilst they match up perfectly with the outer walls (door and window frames), they don't go all the way to the edges of the outer walls. The photograph shows the 2mm or so at each side of the inner wall insert that doesn't reach the outer wall

Enlarged view of the 'problem'  
 Rather than leave this as it is and just paint out the 'probleml from my view it would be a quick and
Boringly gratuitous picture of two painted doors.
dirty solution. To remedy this I'm in the process of making some narrow inserts from the narrower bits cut from the coffee stirrers (what else ?) that I'd used for window frames.
So despite my best efforts to finish the model this week I was still thwarted at the final hurdle and id didn't help that the hospital visit has to be repeated this week too!
 So that it's for this week (sorry C6 but it's going to take even longer), but at least, in my mind, I've made a great deal of progress and as there's little left that can go wrong (fingers crossed) I could well have finished this build.



Thanks for taking the time to read through this never ending build process or for just skimming and looking at the pictures and your comments, of course, are always appreciated. At the very least, I  hope you've found something of interest.





 

24 comments:

  1. So much time and effort going into this and it is paying dividends - great job Joe.

    ReplyDelete
    Replies
    1. Thanks you Michael, I do begrudge the time rather than the foort though, the kit just doesn;t seem to have been too well thought out.

      Delete
  2. I like the weathering on your doors on the last photo mate, it looks really good despite your caption :-)

    ReplyDelete
    Replies
    1. Thanks dGG, adding the photograph was a bit of an afterthought; all the rust effects need to have a little more work done to them, but that'll be one of the final things to do on this build.

      Delete
  3. I'm not very good at thinking of things to say, so I'll just offer my encouragement to you in pushing onwards to the builds end.
    Its looking good, mind.

    ReplyDelete
    Replies
    1. Thanks Roy, you just saying "it's looking good" will suffice for me. I kknow only too well the dfiiculty of commenting on other blogs and trying hard not to say "nice".

      Delete
  4. Great progress Joe! It's looking really "nice". I'm sure you can plough on to the finish, not far now.

    ReplyDelete
    Replies
    1. Thanks Bob,I reckon that there's only a coupe of hours left of assembly/construction band then I'll look to doing some detailing on it.

      Delete
  5. You're making great progress! I'd say it looks good, hopefully you'll be able to show us it in a batrep soon!

    ReplyDelete
    Replies
    1. Thanks N667, it'll be table ready very soon but drumming up enthusiasm for a game may take some time.

      Delete
  6. Despite the challenges this kit has offered I think it is progressing well under your brushes. :)

    ReplyDelete
    Replies
    1. Thanks PC, I'm Ok with the building part but sadly lacking in painting skills, still I do try.

      Delete
  7. It's company ng on great and I'm liking the details you've added. I think I would've lost interest after all the hours you've put in but the light is at the tunnel

    ReplyDelete
    Replies
    1. Thanks Damon, I have little enthusiasm left for this and just want it done with too, but as you say the ennd is truly in sight.

      Delete
  8. Very industrious and looks really effective. Well done.

    ReplyDelete
    Replies
    1. Thanks Irqan; "Industriuos" eh ? - I see what you've done there.

      Delete
  9. Replies
    1. Thanks AL, are you sure "worked" is the correct terminology ? I take it you probably meant you had a job there.

      Delete
  10. Everything you do to it does improve it! Now looking damn good.

    ReplyDelete
    Replies
    1. Thanks Clint, much appreciated but I do wonder if it's worth the extra effort.

      Delete
  11. Replies
    1. Thanks Jay, it's been a long journey getting this completed.

      Delete
  12. Blimey, I hadn't intended to be critical or to push you into excessive effort! This is certainly progressing far faster than any of my own small number of MDF builds...

    ReplyDelete
  13. Hhah, C6 "criticism" can be good as well as bad! I always take comments as encouragement and rarely view them as offensive. I did need to get going on this as my enthusiasm for it was quickly waning and your own output over the last few weeks was inspirational.
    (btw for some reason Blogger won't allow me to 'reply' in the normal way)

    ReplyDelete